St. Cloud Hospital Construction: December 2011 |
| |
 |
| |
New St. Cloud Hospital East Tower
|
| |
October 2011 |
| |
 |
| |
Paving of the new service road on the north side of the east addition.
|
| |
 |
| |
Tearing a wall down.
|
| |
July 2011 |
| |
 |
| |
A mobile scaffold for the bricklayers to lay the brick at the north
side of the east addition.
|
| |
 |
| |
An access hatch to add future air handlers to the top floor.
|
| |
 |
| |
Sunset over the east addition.
|
| |
April 2011 |
| |
 |
| |
North elevation pre cast exterior.
|
| |
 |
| |
Preparing to lay brick in the penthouse on the hospital roof.
|
| |
March 2011 |
| |
 |
| |
5th floor.
|
| |
 |
| |
Framing walls in the operating room.
|
| |
January 2011 |
| |
 |
| |
New addition at night.
|
| |
 |
| |
Concrete pump.
|
| |
 |
| |
East elevation finished through A level.
|
| |
 |
| |
View of the new addition from Sauk Rapids.
|
| |
 |
| |
View of the addition from the north.
|
| |
 |
| |
Surgery hallway with a river view.
|
| |
December 2010 |
| |
 |
| |
View of the addition from the north.
|
| |
 |
| |
Patient floors.
|
| |
 |
| |
New bridge from the Emergency Trauma Center to the South Ramp.
|
| |
November 2010 |
| |
 |
| |
Exhaust piping for the generator.
|
| |
 |
| |
North side of the addition.
|
| |
 |
| |
Duct work being delivered by the truck load.
|
| |
 |
| |
Exhaust piping for the generator.
|
| |
 |
| |
Exterior skin of the building is taking shape.
|
| |
October 2010 |
| |
 |
| |
Surgeons demonstrate the use of a surgical suite in their future space during a site visit.
|
| |
 |
| |
Patient floor.
|
| |
 |
| |
Patient floor.
|
| |
September 2010 |
| |
 |
| |
Patient tower taking shape.
|
| |
 |
| |
Exhaust piping for the generator.
|
| |
 |
| |
Landscaping near the cafeteria.
|
| |
 |
| |
Southeast corner of the addition.
|
| |
 |
| |
Concrete placing boom pumps concrete onto the deck.
|
| |
 |
| |
Pouring the slab on grade in the C Level mechanical room.
|
| |
 |
| |
South view of the river from a patient floor.
|